Skip to Content
Proof Points

Case Studies

Real patterns from Canadian manufacturers. Anonymized to protect our clients, but the outcomes are real.

🏭 Food Manufacturing
MES-First Pilot

Yield improvement and ROI in months — not years

5 weeks
Pilot Duration
+12%
Yield Improvement
90% less
vs. Full Replacement
THE CHALLENGE

A mid-size Canadian food manufacturer was running a legacy MES alongside 6 additional SaaS tools, with no unified view of production yield or waste. Full IoT replacement quotes came in at $1M+ and 18+ months.

OUR APPROACH

MarTecho used the existing MES as the contextual hub. We added targeted sensors at key bottlenecks, built a canonical data model for production records, and deployed a lightweight analytics layer — without touching the core MES.

THE OUTCOME

The pilot ran in 5 weeks. The manufacturer saw measurable yield improvement and could quantify waste reduction within the pilot period. Cost was a fraction of the quoted IoT replacement.

🏗️ Multi-Plant Operations
Scale & Govern

Consistent KPIs and faster rollouts across 5 plants

3x faster
Rollout Speed
100%
Reporting Consistency
5 sites
Plants Scaled
THE CHALLENGE

A multi-site Canadian manufacturer had a successful pilot at one plant but couldn't replicate it. Each site had different systems, different reporting formats, and different IT staff — leading to inconsistent data and slow rollouts.

OUR APPROACH

MarTecho codified the pilot into reusable connector configurations and a canonical data model. We built a governance playbook, standardized KPI definitions, and ran training sessions at each site.

THE OUTCOME

Rollout time per plant dropped by 3x. All sites now report against the same KPI framework, enabling corporate-level dashboards for the first time. Compliance audits became routine instead of chaotic.

PIPEDA Aware
CASL Compliant
Canadian Data Residency